Front
will be done with 51/2" lifted
floors custom made subframe to conect all mounting points,
lifted
steeringbox,raised bumber mounts ( 1" )relocated steering Knuckles.
NEW
custom made AIRbag beam with firestone 2500# bags in front using 1/2" line.
wolfgang
lowered spindels are also going to be used as well..
total
estimated drop in front will be @ 10"
Rear
is going to be a little tough.
Creative
engineerings I.R.S conversion will be used for the MAIN tranny mounts only.
1968
I.R.S bus trans will take the place of my type3 swing,Then i am fabricateing
a custom Four link
With
five mounting points so I guess it will be a FIVE link!
Firestone
2600# bags in the rear will be used
With
all said and done the rear should damn near sit on the tranny mount!
Pics
will be posted as soon as available..
HOME
Stripped
Off
to the body shop
Bus
comes Home
Redoing
ALL of The Body Work
Various
Door Jambs
SAFARI
WINDOWS!
Sound
Proofing
The Arizona Gecko Co. The Audio House